BALL POOL MAINTENANCE AND USE

Metal parts inspection and maintenance

The frame connections of the playground should be checked periodically, loose screws in the connections should be tightened (every 15 days).
Slide connection points in the playground should be checked periodically and faults in the connection section should be eliminated (every 15 days).
The connection bolts in the ‘floor’ section of the playground should be checked periodically and the loosened bolts should be tightened (every 15 days).

Control and Maintenance of the Environmental Protection Network

Protective nets in the playground should be checked periodically, tears and tears that may occur in the nets should be repaired (every 15 days).

Inspection and Maintenance of Ball Pool Tarpaulins

Rollers and boxing tarpaulins in the playground should be checked periodically, the fixing iron on the rollers should be replaced as soon as it is dislodged, the loosening of the connection columns in the boxing should be corrected by reconnecting. (Every 15 days)
The pasta in the playground should be checked periodically, repaired if there is tearing and disassembly, and replaced with a new one if it cannot be repaired (every 15 days).

Cleaning

The balls in the playground should be periodically sterilised and hygiene should be ensured (once a month).
Slide, pasta, boxing, roller, obstacle and tarpaulins in the playground should be checked and cleaned by wiping with a damp cloth.
Playground perimeter protection nets should be cleaned with detergent water and brush.

Things to do in bad weather conditions

If the product is to be used outdoors, precautions should be taken according to the weather conditions to prevent damage.
It is forbidden to use the Ball Pool in windy, snowy and stormy weather.
Take the Ball Pool under shelter or remove the product in windy, snowy and stormy weather.

Whatsapp Contact Whatsapp Contact